Search
All distribution media products must be registered with the MPCA.
Create an editable spreadsheet with the information indicated below. Each step in your calculations needs to be clear and easy to follow.Facility informationProvide the facility information listed on…
Certain proposed projects — based on their nature, size, location, or other factors — must go through an environmental review before any required permits or approvals are issued.
States are responsible for developing a Regional Haze State Implementation Plan (SIP) that addresses regional haze in each Class I area located within the state and in each Class I area located…
MPCA releases initial environmental assessment worksheet for a new municipal solid waste landfill proposed by Dem-Con at its environmental campus near Shakopee.
The MPCA fined Heron Lake BioEnergy $18,174 for failing to properly maintain safety controls and inspect storage tanks on its property.
MPCA plans to amend existing Minnesota Rules governing permits and solid waste landfills (chapters 7001 and 7035).
Use these checklists to speed review and approval of wastewater design documents
An individual solid waste permit is tailored to a specific solid waste facility or activity.
BNSF Railway Company paid a fine of $20,000 for industrial stormwater and wastewater permit violations at its Willmar facility.
Completed rulemaking for changes to reporting requirements for hazardous air pollutants (HAPs).
Complaints of discrimination will be investigated
General permit intended for facilities using processes including abrasive blasting, brazing, catalytic or thermal oxidizers, dip tanks, injection molding, resin and gel coating, spraying and coating activities, and welding.
Permit addresses the most common causes of contaminated groundwater, including releases of petroleum, volatile organic compounds, and other hazardous substances.
The MPCA sought proposals from qualified responders to conduct an environmental forensics evaluation using non-targeted analysis techniques for identifying sources of non-aqueous film forming foam (non-AFFF) per- and polyfluoroalkyl substances (PFAS) contamination in water.
As part of the PFAS pollution prevention law called Amara’s Law, manufacturers are required to report intentionally added PFAS in products sold in Minnesota and pay a fee. The Minnesota Pollution Control Agency has extended the reporting due date to Sept. 15, 2026.
To obtain coverage under this permit, the owner(s) must document compliance with the criteria for coverage under this general permit, prior to disposal of the uncontaminated concrete.
Alliance Building Corporation failed to prevent liquid washout of waste during construction at the Sleepy Eye Apartments.
ECSWC is applying for a 10-year permit to add MSW capacity to its currently permitted landfill near Mora while conducting environmental review for the unpermitted areas of its landfill expansion.
Important details to help make your e-Service administrative submittal go as smoothly as possible.