Search
Elk River Landfill, Inc. proposes a northward expansion of its landfill into Livonia Township.
Any facility that emits air pollutants above certain levels is required to have an air quality permit.
East Central Solid Waste Commission (ECSWC) proposes to add 1.7 million cubic yards of MSW capacity to their landfill near Mora, Minnesota, which requires an environmental impact statement.
Do not throw any hazardous waste in the trash; instead, bring it to a local collection site. Each county in Minnesota administers a household hazardous waste program to help prevent hazardous chemicals from getting into the environment and harming human health.
Minnesota industrial stormwater permittees in certain industries to monitor for PFAS in their stormwater runoff or snow.
Climate adaptation identifies strategies and actions that help human and natural systems cope with and become more resilient to the impacts of climate change.
MPCA guidance for evaluating when closed landfills may exit the postclosure care phase.
MPCA permits are required for extensions, additions, or other modifications to sanitary sewer collection systems that result in new or increased discharges of pollutants.
The Minnesota Pollution Control Agency is planning amendments to rules governing water quality fees (Minn. R. ch. 7002 and 7083).
The MPCA fined Heron Lake BioEnergy $18,174 for failing to properly maintain safety controls and inspect storage tanks on its property.
A 2008 law requires the MPCA to analyze and consider “cumulative levels and effects of past and current pollution” for air permits in a specific part of south Minneapolis.
All distribution media products must be registered with the MPCA.
Use these checklists to speed review and approval of wastewater design documents
An individual solid waste permit is tailored to a specific solid waste facility or activity.
BNSF Railway Company paid a fine of $20,000 for industrial stormwater and wastewater permit violations at its Willmar facility.
MPCA releases initial environmental assessment worksheet for a new municipal solid waste landfill proposed by Dem-Con at its environmental campus near Shakopee.
Permit addresses the most common causes of contaminated groundwater, including releases of petroleum, volatile organic compounds, and other hazardous substances.
General permit intended for facilities using processes including abrasive blasting, brazing, catalytic or thermal oxidizers, dip tanks, injection molding, resin and gel coating, spraying and coating activities, and welding.
The MPCA sought proposals from qualified responders to conduct an environmental forensics evaluation using non-targeted analysis techniques for identifying sources of non-aqueous film forming foam (non-AFFF) per- and polyfluoroalkyl substances (PFAS) contamination in water.
Create an editable spreadsheet with the information indicated below. Each step in your calculations needs to be clear and easy to follow.Facility informationProvide the facility information listed on…