Search
Dem-Con is proposing a new facility that will process organic materials through anaerobic digesters at its environmental campus in Shakopee. The project requires an environmental assessment worksheet (EAW) and an air permit from the MPCA.
Superfund requires specific investigation and cleanup processes, designates parties that are legally responsible for the cleanup, and provides funds for certain types of cleanups under Minnesota’s Environmental Response and Liability Act (MERLA).
With completion of the EAW review process, the MPCA will move forward with issuing West River Dairy’s feedlot permit on June 23.
The Minnesota Pollution Control Agency (MPCA)’s draft wastewater permit for the 3M facility at Cottage Grove adds new water quality protections for the Mississippi River and improves accountability through monitoring and reporting requirements. The draft permit is one of the most rigorous in state history and mandates the removal of certain per- and polyfluoroalkyl substances (PFAS) to levels below detection.
Intense storms of late spring can wash soil and other pollutants into rivers. Producers can use several techniques to protect their soil and water quality.
The MPCA is working to address environmental concerns at the closed Freeway Landfill, to prevent the buried waste from affecting drinking water and the nearby Minnesota River.
Some pollutants attach to suspended particles in the water and subsequently settle out to the bottom sediment. At elevated concentrations, contaminated sediments can contribute to fish…
The MPCA sought proposals from qualified responders to conduct an environmental forensics evaluation using non-targeted analysis techniques for identifying sources of non-aqueous film forming foam (non-AFFF) per- and polyfluoroalkyl substances (PFAS) contamination in water.
BMPs required to manage the slurry to comply with Minnesota statute and agency rules to protect water quality.
The MPCA closed 118 enforcement cases for water quality, air quality, waste, stormwater, and wastewater violations in the second half of 2023.
MPCA releases initial environmental assessment worksheet for a new municipal solid waste landfill proposed by Dem-Con at its environmental campus near Shakopee.
State experts anticipate an active summer for air quality alerts with recurring ozone and wildfire smoke events
Underground storage tank (UST) facilities must designate owners, operators, or employees as Class A, Class B, and Class C operators.
Long-term lake management considers the unique environmental, cultural, and biological factors affecting the lake and sets a priority on finding lasting solutions.
Farmers Grain, LLC, a grain elevator in Thief River Falls, paid $18,120 in fines for pumping contaminated water from their property into the city of Thief River Falls stormwater system.
East Central Solid Waste Commission (ECSWC) proposes to add 1.7 million cubic yards of MSW capacity to their landfill near Mora, Minnesota, which requires an environmental impact statement.
The MPCA has developed guidance on a number of topics to assist real estate developers, environmental engineers, remediation consultants, and others in addressing brownfields and contaminated sites.
Privacy rightsSeveral federal and state laws protect your privacy rights regarding the information the MPCA has about you. At times, an MPCA staff member may ask you to provide information about…
Minnesota’s biosolids PFAS strategy requires all biosolids intended for land application be tested for PFAS before use and response actions based on sample results.
Permits help the MPCA protect the environment.