Information and references for grantees with projects funded by the VW Settlement in Minnesota.
Sample grant agreement
To help understand what the grant agreement might look like if one is awarded, here is a sample State of Minnesota grant agreement. Much of the language reflected in the agreement is required by statute.
Level 2 electric vehicle (EV) charging station grants (FY2023)
Reference documents for project evaluation.
EV charging
Installation requirements for EV charging stations to ensure Minnesota state agencies comply with Americans with Disabilities Act (ADA) guidelines.
On-road and off-road replacements
This form helps summarize the reimbursement request being submitted by grantees and should be included with other required forms and photos.
This form should be included for grant reimbursement requests requiring verification that an engine/vehicle was disabled.
Volkswagen (VW) settlement replacement grants require that the old vehicle’s engine and frame be disabled so it cannot operate and pollute again. A minimum of six photos are requested to validate this work has been done. Refer to this guide for examples of what MPCA needs for reimbursement.