Skip to main content

North Fork Crow River

Railroad cars on bridge crossing a river.

The North Fork Crow River watershed covers 949,107 acres. The headwaters for the North Fork Crow River are located in Pope County at the outlet of Grove Lake. The river flows about 120 miles southeast from Grove Lake to the confluence with the South Fork Crow River in Rockford and on to the confluence with the Mississippi River near Dayton. The Middle Fork Crow River which joins the North Fork near Manannah is a major tributary to the North Fork Crow River. Parts of Pope, Kandiyohi, Stearns, Meeker and Wright counties are in this watershed. Major cities are Litchfield, St. Michael, Buffalo, Otsego, Dayton and Rockford.

Land use in the North Fork Crow River watershed is mostly agricultural with the exception of the eastern portion that is metro fringe urban and commercial.

Many of lakes and reaches of the North Fork Crow River do not meet water quality standards for beneficial uses such as aquatic recreation, drinking, and swimming. The main lake pollutant is phosphorus, causing algae blooms in summer months, and reaches of the North Fork Crow River are listed for biological, bacteria, dissolved oxygen, and turbidity impairments.

Strategy development for restoration and protection

Global: Public comment on TMDL Modifications for Stormwater Wasteload Allocations
Speech bubbles

Proposed TMDL modifications to 13 TMDLs for stormwater wasteload allocations to reflect changes in these watersheds since they were approved by U.S. EPA. Visit the posting in SmartComment to review the draft documents and provide feedback. The comment period runs Jan. 5-Feb. 4, 2026.

TMDL projects in the watershed

Global: Public comment on TMDL Modifications for Stormwater Wasteload Allocations
Speech bubbles

Proposed TMDL modifications to 13 TMDLs for stormwater wasteload allocations to reflect changes in these watersheds since they were approved by U.S. EPA. Visit the posting in SmartComment to review the draft documents and provide feedback. The comment period runs Jan. 5-Feb. 4, 2026.

Contact

Scott Lucas
Watershed project manager
218-316-3915