Search
East Central Solid Waste Commission (ECSWC) proposes to add 1.7 million cubic yards of MSW capacity to their landfill near Mora, Minnesota, which requires an environmental impact statement.
The Minnesota Repair Project is one of several initiatives that received a grant from the Minnesota Pollution Control Agency aimed at reducing waste and boosting reuse across the state.
Public entities In Minnesota, most sustainable purchasing requirements are implemented at the local government level. However, there are some state requirements for public entities: Minnesota state…
MPCA's environmental review process for feedlots operates according to the rules of the Environmental Quality Board.
MPCA seeks public comment on two draft industrial wastewater permits for U.S. Steel Corp.’s Keetac mining area and tailings basin in Keewatin, Minnesota. These permits will improve protections for wild rice waters and human health.
Helped by an MPCA grant, Coon Rapids increased local options for electric vehicle drivers with two new charging stations at public buildings.
MPCA releases initial environmental assessment worksheet for a new municipal solid waste landfill proposed by Dem-Con at its environmental campus near Shakopee.
The PFAS guidance document uses an evidence-based approach that builds upon the framework and strategies presented in previous MPCA publications.
Properly trained and certified SSTS personnel are critical. What work duties can local program staff do before becoming certified, and how can that process be expedited?
The MPCA released its environmental assessment worksheet (EAW) for the proposed expansion of Crow Wing County’s existing mixed municipal solid waste landfill northeast of Brainerd.
Implementing water quality standards come with tangible costs and benefits. Costs such as taxes to residents, regulated parties, and communities help achieve benefits such as increased property values, tourism, and protecting human health.
Environmental Assessment Worksheets (EAW) and Environmental Impact Statements (EIS) are part of MPCA's environmental review, providing a standardized and public process to disclose information about the potential negative environmental effects of a proposed development and ways to avoid or minimize them before the project is permitted and built.
Smart Salting is a suite of techniques that minimize the environmental and economic impacts of chloride while still meeting public needs.
MPCA permits are required for construction, modification, and operation of facilities where solid waste is treated, stored, processed, transferred, or disposed.
The Minnesota Pollution Control Agency has developed a draft air permit for MagIron LLC in Coleraine that will require a fugitive dust control plan to help reduce emissions of particulate matter from roads, storage, stockpiles, and exposed mining areas.
Documents and forms related to the identification and management of hazardous waste in Minnesota.
Guidance and recommendations for local officials dealing with public health issues related to blue-green algae.
Apply for the 2025-2026 Minnesota GreenCorps program and spend a year working on environmental issues and making a difference in communities around the state.
Medicines flushed down the drain can contaminate water, which can hurt fish and other aquatic wildlife, and end up in our drinking water.
Through a certificate of need process, MPCA is offering existing landfills the opportunity to expand their existing capacity.