Search
MPCA investigation found that Rainy Lake Oil failed to repair a pipe that was leaking diesel fuel underground for more than four months in 2024.
Carver County and Valley Paving Inc. failed to properly install and maintain erosion and sediment controls during a highway safety improvement project in the fall 2022 and spring 2023 near Watertown, Minn. This caused significant erosion and sediment to impact several area surface waters.
The MPCA has withdrawn proposed rules relating to waste treated seeds.
BMPs required to manage the slurry to comply with Minnesota statute and agency rules to protect water quality.
MPCA investigation determined that construction sediment was discharged into the Blue Earth River and a county ditch.
The MPCA monitors water quality in rivers and streams is several different ways around the state.
In October 2023, New Ulm Steel failed a noise test at its facility. New Ulm Steel was also fined for dust escaping the facility and settling on a public road.
Failed to properly operate its wastewater treatment facility for the River Park housing development in Oronoco, Minnesota, from Aug.-Dec 2023 before connecting to the newly constructed Oronoco wastewater treatment plant.
The Root River starts as a drainage ditch in Mower County, then winds 81 miles from intensely farmed areas through more wooded, rolling terrain, and finally empties into the Mississippi River south of La Crosse, Wisconsin.
KODA Energy violated its air permit in Scott County from June 2023 to February 2024, according to a Minnesota Pollution Control Agency (MPCA) enforcement investigation. The investigation found KODA energy was burning waste-treated corn and should have submitted a major permit amendment before burning an industrial solid as a waste-to-energy incineration facility.
DENCO II LLC failed a stack test in April, 2024, that showed that the facility exceeded its permit limit for particulate matter by more than 170%.
S.M. Hentges & Sons, a Jordan-based construction company, paid $13,078 for construction stormwater violations for a project in Chaska.
Company failed to install and upgrade equipment compatible with the fuels it was storing at seven of its convenience stores in Freeborn and Mower counties.
Image Whenever feedlot construction or expansion is proposed, the MPCA or delegated county feedlot officer must be notified, even if a permit is not…
Lakes Concrete Plus, Inc. paid $25,000 in fines for selling 1,500-gallon and 2,000-gallon septic tanks from 2019 to 2022 that may contain weep holes, a violation of Minnesota law.
BNSF Railway Company paid a fine of $20,000 for industrial stormwater and wastewater permit violations at its Willmar facility.
Lange Agricultural Systems paid $12,511 for violations of both its hazardous waste and industrial wastewater permits.
One of 12 major watersheds of the Minnesota River Basin, the Watonwan River Watershed covers 878 square miles in south-central Minnesota.
Environmental information and resources for the biochar industry.
Profile of Julia Dady, a volunteer water monitor for Battle Creek in Saint Paul.