Search
The MPCA must complete assessments to gather critical information too inform the development of the EPR program statewide.
The Minnesota Pollution Control Agency (MPCA) today released an environmental assessment worksheet (EAW) for a new facility proposed by Dem-Con that will process organic materials through anaerobic digesters at its environmental campus in Shakopee, Minnesota.
Sulfur dioxide (SO2), a foul-smelling toxic gas, is part of a larger group of chemicals called sulfur oxides. These gases, especially SO2, are emitted by the burning of fossil fuels or other…
Vapor intrusion occurs when chemical vapors migrate from contaminated groundwater through the soil into the basements or foundations of buildings.
Feedlot nutrient and manure management
Medicines flushed down the drain can contaminate water, which can hurt fish and other aquatic wildlife, and end up in our drinking water.
The chemical 1,4-dioxane, a likely carcinogen, was detected in a private residential well in the Eastbrook Terrace area in Andover.
MPCA has developed a draft wastewater permit for the MagIron LLC facility near Grand Rapids, Minn. The facility will process former natural iron ore mining waste material into high-grade, low-impurity iron ore concentrate at the site and supply electric arc furnace steelmaking.
The Watershed Pollutant Load Monitoring Network (WPLMN) is a partnership that collects data on water quality and flow in Minnesota.
Studies of Minnesota’s waters show that contaminants of emerging concern are widespread in the state’s lakes and rivers.
Completed rulemaking for changes to reporting requirements for hazardous air pollutants (HAPs).
Construction and interim feedlot permit forms
The MPCA regulates waste, recycling, and disposal activities in Minnesota. MPCA permits are required for the design, construction, and operation of solid waste management facilities where storage, collection, transportation, processing or reuse, conversion, or disposal of solid waste occurs.
MPCA guidance for evaluating when closed landfills may exit the postclosure care phase.
The MPCA sought proposals to conduct a bench study to evaluate the effectiveness and potential dosages of soil amendments at the bench scale to support the analysis, decision making, and planning required to implement remedial actions for the Precision Plating Superfund site
Best practices for SSTS installations drafted by St. Louis County, Minn., in 2008 based on the experiences of SSTS installers and inspectors.
Recycling market development works to expand end markets and boost the demand for recycled materials.
Healthy land and soil is essential for thriving Minnesota communities. It drives economic development and opportunity, improves our health, and contributes to clean water for drinking and recreation…
To obtain coverage under this permit, the owner(s) must document compliance with the criteria for coverage under this general permit, prior to disposal of the uncontaminated concrete.
This page provides assistance for local units of government with development and implementation of their SSTS program.