Search
This advisory board includes 18 individuals representing a wide range of impacted parties under the Packaging Waste and Cost Reduction Act.
Installing an engineNo permit amendments are needed for holders of registration (Options C and D), capped, and general permits (state or Part 70) to install a non-emergency engine, if the total…
A waste tire transporter removes waste tires from a waste tire generator, tire dump, or waste tire facility and delivers the waste tires for aggregation, storage, or processing.
Heartland Corn Products failed emission stack tests in November 2021 and February 2022 for volatile organic compounds and particulates at its ethanol production facility in Winthrop, Minn.
Every two years, MPCA creates a list of impaired waters in the state that do not meet water quality standards.
Northshore Mining operates the Peter Mitchell Mine, a taconite ore mining operation, in Babbitt. It sends the ore that it mines there via rail to a processing plant in Silver Bay, which is a separate facility with its own individual air permit.
Licensing and certification requirements for SSTS businesses and professionals.
Environmental information and permits that affect businesses using stationary engines or generators.
This RFP dedicated $2 million toward activities related to planning and design of PFAS treatment/separation and/or destruction technologies at municipal wastewater facilities, landfills, and/or industries in Minnesota.
Ready-to-run meteorological data suitable for AERMOD.
The MPCA studies, monitors, and regulates numerous water pollutants to protect human health and the environment. At the state level, three agencies share the monitoring and control of pollutants:the…
Bacteriological reduction products registered for use in Minnesota
In 2009, a federal court ruled that NPDES permits were required for all biological and chemical pesticide applications that leave a residue in water when applications are made in, over, or near waters of the United States.
A permit extension notification allows transfer stations and source-separated organic material (SSOM) compost facilities to apply for an extension of their permit without a complete permit reissuance application.
MPCA's recommended review criteria for wastewater treatment facilities that need to perform system maintenance that requires approval to bypass untreated or partially treated domestic wastewater.
MPCA rules govern how septic systems are designed, installed, and managed.
The MPCA provides additional guidance on air permitting and regulation requirements: New source review – Obtain a permit before beginning construction on new major-emitting industrial facilities…
MPCA investigators say West Fraser paid a fine of $15,775 for air permit violations at their facility in Solway.
This RFP provides a mechanism for interested parties to acquire a limited volume of PFAS concentrate for PFAS destructive technology testing purposes.
Our strategic plan has six broad goals that, when taken together, map our work for five years. MPCA’s strategic plan guides the agency’s work from Jan. 1, 2024, to Dec. 31, 2028. These goals are…