Search
MPCA municipal wastewater permit staff
The Mississippi River - Sartell Watershed covers approximately 652,800 acres (1,020 sq. miles) in the central part of the Upper Mississippi River Basin. The watershed includes parts of Benton, Crow Wing, Mille Lacs, Morrison, Stearns, and Todd counties.
Significant restoration work by organizations in the area have made the south branch of the Buffalo River a water-quality success story.
The Minnesota Retiree Environmental Technical Assistance Program (RETAP) employs skilled, retired professionals to provide facility assessments to small businesses, institutions, and city and county governments in Minnesota.
Whether they are called sloughs, swamps, bogs, or potholes, these are all wetlands and they provide many environmental benefits and contribute to watershed health. Though Minnesota has lost almost half of its wetland acreage over time, the quality of the remaining wetlands is good overall.
Failed to properly operate its wastewater treatment facility for the River Park housing development in Oronoco, Minnesota, from Aug.-Dec 2023 before connecting to the newly constructed Oronoco wastewater treatment plant.
SkyWater Technology violated federal laws and Minnesota rules, operating a semiconductor plant without an appropriate air permit in Bloomington, Minnesota.
Grede Foundry violated the terms of its air permit in 2024, according to a Minnesota Pollution Control Agency investigation.
Industrial Stormwater Steps to Compliance - Step 3: Facilities requiring permit coverage must assess for pollutants at the facility
Permit addresses the most common causes of contaminated groundwater, including releases of petroleum, volatile organic compounds, and other hazardous substances.
People who service and dispose of vehicle air conditioners or appliances that contain refrigerants must be certified.
The MPCA fined Cabinetworks Group’s Waconia facility, Wood Products, $11,520 for violations of its air permit.
The MPCA fined Zippel Bay Resort $37,800 for a number of violations stemming from the operation of an unregistered gas tank that leaked gasoline into Lake of the Woods.
An MPCA investigation found that Benson Municipal Utilities failed to conduct required carbon monoxide tests within their permit deadline for their five generators providing emergency power services to the city.
Tailings basin piping leaked wastewater and about 11,500 cubic feet of tailings materials over nearly half an acre, including a nearby wetland in May 2023 due to inadequate operation and maintenance of the tailings basin pipeline at the company’s facility in Virginia, Minn.
Project began construction in October 2022 without a stormwater permit or a stormwater pollution prevention plan, and failed to install erosion and sediment controls at a pond and wetland improvement site near Finlayson, Minn.
Failed to obtain a construction stormwater permit prior to beginning construction and allowed sediment to discharge to wetlands as they built The Meadows housing development in Otsego, Minnesota.
Louisiana-Pacific has been fined $15,775 for stormwater and wetland violations according to a Minnesota Pollution Control Agency (MPCA) enforcement investigation. Louisiana-Pacific operates a wood-board manufacturing facility in Two Harbors, Minnesota.
Recycling materials into new products benefits both our environment and our economy.
If you're new to the septic system world at the county level, or even if you've been in the job for a while, MPCA offers videos and companion documents to provide valuable background and insights.