Search
The Meadows Mobile Home Park discharged untreated sewage to the ground in two separate violations in 2025.
An inspection in 2024 discovered multiple violations at this site in , including failure to conduct testing of tank systems that prevent leaks and corrosion and a broken gauge used in tank leak detection tests.
New Flyer of America, a bus assembly plant in Saint Cloud, paid $12,112.50 for hazardous waste violations.
Loans of up to $75,000 at zero-percent interest help small businesses purchase equipment to meet or exceed environmental regulations, or to investigate and clean up contaminated sites.
Carver County and Valley Paving Inc. failed to properly install and maintain erosion and sediment controls during a highway safety improvement project in the fall 2022 and spring 2023 near Watertown, Minn. This caused significant erosion and sediment to impact several area surface waters.
Cleveland-Cliffs owns the Minorca Mine northeast of Virginia, Minnesota. The mine’s two taconite mining pits are about one mile southeast of the plant.
During a residential construction project in Franklin Township in 2024, Capstone Homes and Arnt Construction failed to properly manage construction stormwater activities.
An MPCA investigation determined David Heinonen of Grand Rapids filled in 3,200 square feet of wetland near Horsehead Lake in Itasca County without prior approval and engaged in unpermitted construction activities on 1.57 acres on the shore of Horsehead Lake.
The MPCA works with city and county governments, watershed districts, consultants, and others on monitoring, protecting, and restoring water quality. This is a repository of guidance and technical resources for agency partners.
$4.85 million to run community air monitoring projects in the 7-county Metropolitan Area (counties of Anoka, Carver, Dakota, Hennepin, Ramsey, Scott, and Washington).
The Minnesota Pollution Control Agency seeks public comment on a draft industrial wastewater permit that provides various improvements to better protect the environment and human health at Northshore Mining Co.'s taconite processing facility and tailings basin in Silver Bay, Minnesota.
The MPCA has developed guidance on a number of topics to assist real estate developers, environmental engineers, remediation consultants, and others in addressing brownfields and contaminated sites.…
The MPCA had $5 million available to support the implementation of projects to increase resilience to the impacts of climate change in communities across Minnesota.
The MPCA regulates both underground and aboveground commercial storage tanks above a certain size that hold petroleum or hazardous liquids.
Environmental information and permits that affect hot mix asphalt plants.
This feature summarizes findings from four WRAPS reports in 2024: Root River, Mississippi River-St. Cloud, Pomme de Terre River, and Mississippi River-Lake Pepin Tributaries.
Details for solid waste management facility permit issuance and reissuance.
SkyWater Technology violated federal laws and Minnesota rules, operating a semiconductor plant without an appropriate air permit in Bloomington, Minnesota.
MPCA investigation found that Heron Lake BioEnergy LLC exceeded its permitted limits of particulate matter (PM) and hazardous air pollutants (HAPs) at its plant in Jackson County.
The MPCA fined Caledonia feedlot owner Mike Ingvalson $10,000 for multiple violations related to improper manure application and discharges as well as an unpermitted building.