Search
The MPCA sought proposals to conduct a bench study to evaluate the effectiveness and potential dosages of soil amendments at the bench scale to support the analysis, decision making, and planning required to implement remedial actions for the Precision Plating Superfund site
Graphic timeline that outlines how the permitting process and environmental review process progress simultaneously.
MPCA is opening the rule that regulates about 17,000 animal feedlots.
The MPCA sought project proposals to distribute $1.1 million in grants for climate planning projects to small communities with populations of less than 10,000.
$4.85 million to run community air monitoring projects in the 7-county Metropolitan Area (counties of Anoka, Carver, Dakota, Hennepin, Ramsey, Scott, and Washington).
The MPCA created a statewide inventory of streams that have been hydrologically modified: channelized, ditched, or impounded
Any facility that emits air pollutants above certain levels is required to have an air quality permit.
Privacy rightsSeveral federal and state laws protect your privacy rights regarding the information the MPCA has about you. At times, an MPCA staff member may ask you to provide information about…
Industrial Finishing Inc. violated several water quality permit conditions relating to required sampling, training, reporting and inspections at its industrial equipment coating and finishing facility in Deer Creek, Minn.
Central Specialties Inc., based in Alexandria, violated several air permit conditions between 2021 and 2023 for its mobile hot-mix asphalt facility stationed at various locations around the state. Violations included failing to properly maintain pollution control equipment and inadequate recordkeeping and reporting.
The Minnesota portion of the Roseau River watershed covers 774,197 acres; an additional 594,560 acres are across the U.S. border in Canada.
The Minnesota River - Mankato Watershed covers 861,886 acres across Cottonwood, Brown, Redwood, Renville, Sibley, Nicollet, Blue Earth, and Le Sueur counties in south-central Minnesota.
The capped emission permit is designed for non-complex facilities that do not require site-specific permit conditions.
General permit intended for facilities using processes including abrasive blasting, brazing, catalytic or thermal oxidizers, dip tanks, injection molding, resin and gel coating, spraying and coating activities, and welding.
MPCA rules govern how septic systems are designed, installed, and managed in Minnesota.
Demonstration/research projects (DRPs) allow permittees to explore potential beneficial uses or new methods of solid waste management through a limited-scale project.
Businesses can find many ways to increase competitiveness and boost productivity.
Initial screening information for a contaminant of emerging concern, beta-sitosterol.
The MPCA must complete assessments to gather critical information too inform the development of the EPR program statewide.
“Area C” is the name given to Ford Motor Company’s former industrial waste dump on the floodplain of the Mississippi River, at the base of the bluff below the former Twin Cities Assembly Plant in Saint Paul.