Search
Environmental information and permits that affect wood-finishing industries.
Environmental information and permits that affect hot mix asphalt plants.
Under the Minnesota Electronics Recycling Act, the MPCA wishes to shift the responsibility for paying for collection and recycling of "covered electronic devices" away from the public sector, specifically local government.
The MPCA has adopted amended rules relating to when maintenance of a closed landfill should end.
An individual solid waste permit is tailored to a specific solid waste facility or activity.
Industrial Stormwater Steps to Compliance - Step 2: Consider certifying for No Exposure
MPCA completed 100 enforcement cases for water quality, air quality, waste, stormwater, and wastewater violations in the first half of 2024
Solid waste facilities may close or terminate their permit depending on the solid waste activities occurring at the site.
A permit extension notification allows transfer stations and source-separated organic material (SSOM) compost facilities to apply for an extension of their permit without a complete permit reissuance application.
Details for solid waste management facility permit issuance and reissuance.
“Area C” is the name given to Ford Motor Company’s former industrial waste dump on the floodplain of the Mississippi River, at the base of the bluff below the former Twin Cities Assembly Plant in Saint Paul.
Based on volume, construction and demolition debris presents a big opportunity for reducing waste and its environmental effects.
Dem-Con is proposing a change to begin accepting municipal solid waste (MSW), converting approximately 2.2 million cubic yards of permitted construction and demolition (C&D) space. A project of this size requires the project to go through the Environmental Impact Statement (EIS) process.
General Waste and Recycling, LLC plans to convert approximately 19 acres of permitted industrial solid waste space in Itasca County so that it can accept nearly 100,000 cubic yards of municipal solid waste (MSW) per year.
The MPCA released its environmental assessment worksheet (EAW) for the proposed expansion of Crow Wing County’s existing mixed municipal solid waste landfill northeast of Brainerd.
Mankato nonprofit South Central Minnesota Food Recovery used MPCA grant money to build out a network to save food from the landfill and distribute it to people in need.
Any facility that is engaged in a narrative activity or a primary SIC code, as listed in the Multi-Sector General Permit, needs to apply for industrial stormwater permit coverage or certify for No Exposure.
Increasing organics collection and processing infrastructure is necessary to meet statewide recycling goals
MPCA guidance for evaluating when closed landfills may exit the postclosure care phase.
Elk River Landfill, Inc. proposes a northward expansion of its landfill into Livonia Township.