The MPCA fined Cabinetworks Group’s Waconia facility, Wood Products, $11,520 for violations of its air permit.
The fines stem from a release of sediment-laden water into a county ditch, and subsequent failures to notify, repair, and report on the incident.
The MPCA is currently recruiting volunteers to measure water clarity in numerous lakes and streams across the state and then report the data back to the agency.
The MPCA fined Caledonia feedlot owner Mike Ingvalson $10,000 for multiple violations related to improper manure application and discharges as well as an unpermitted building.
The MPCA fined Zippel Bay Resort $37,800 for a number of violations stemming from the operation of an unregistered gas tank that leaked gasoline into Lake of the Woods.
An MPCA investigation found that Benson Municipal Utilities failed to conduct required carbon monoxide tests within their permit deadline for their five generators providing emergency power services to the city.
Tailings basin piping leaked wastewater and about 11,500 cubic feet of tailings materials over nearly half an acre, including a nearby wetland in May 2023 due to inadequate operation and maintenance of the tailings basin pipeline at the company’s facility in Virginia, Minn.
MPCA investigation shows the city violated its wastewater permit in Freeborn County from April 2021 to April 2023.
Project began construction in October 2022 without a stormwater permit or a stormwater pollution prevention plan, and failed to install erosion and sediment controls at a pond and wetland improvement site near Finlayson, Minn.
Failed to properly operate its wastewater treatment facility for the River Park housing development in Oronoco, Minnesota, from Aug.-Dec 2023 before connecting to the newly constructed Oronoco wastewater treatment plant.
SkyWater Technology violated federal laws and Minnesota rules, operating a semiconductor plant without an appropriate air permit in Bloomington, Minnesota.
Industrial Stormwater Steps to Compliance - Step 3: Facilities requiring permit coverage must assess for pollutants at the facility
Recycling materials into new products benefits both our environment and our economy.
If you're new to the septic system world at the county level, or even if you've been in the job for a while, MPCA offers videos and companion documents to provide valuable background and insights.
From 2023-2025, Northshore Mining released recycled water to the ground seven times and water relating to mining processes four times. Its largest unpermitted release was nearly 400,000 gallons of recycled water. Northshore Mining has documented equipment failure as the reason for the 11 releases.
MPCA investigation found that Rainy Lake Oil failed to repair a pipe that was leaking diesel fuel underground for more than four months in 2024.
Alliance Building Corporation failed to prevent liquid washout of waste during construction at the Sleepy Eye Apartments.
According to a Minnesota Pollution Control Agency (MPCA) enforcement investigation, Elliott Auto Supply Co. improperly stored hazardous waste, allowed them to accumulate and leak inside its vehicle fluid manufacturing facility in St. Paul, Minn.
Carver County and Valley Paving Inc. failed to properly install and maintain erosion and sediment controls during a highway safety improvement project in the fall 2022 and spring 2023 near Watertown, Minn. This caused significant erosion and sediment to impact several area surface waters.
Failed to obtain a construction stormwater permit prior to beginning construction and allowed sediment to discharge to wetlands as they built The Meadows housing development in Otsego, Minnesota.