Search
Violated Minnesota rules and federal standards on several occasions at a barley malting facility located in Moorhead, Minnesota.
New Flyer of America, a bus assembly plant in Saint Cloud, paid $12,112.50 for hazardous waste violations.
The Olmsted Soil and Water Conservation District's Soil Health Farm demonstrates how farmers can benefit from practices that also provide resilience to climate change.
An MPCA investigation determined that General Mills violated state rule at its oat processing facility in Fridley on several occasions from 2019 through 2023.
During a residential construction project in Franklin Township in 2024, Capstone Homes and Arnt Construction failed to properly manage construction stormwater activities.
The MPCA fined Regions Hospital $100,000 for improperly disposing of infectious waste in its mixed municipal solid waste in 2024.
Lange Agricultural Systems paid $12,511 for violations of both its hazardous waste and industrial wastewater permits.
Failed emissions performance stack tests on two boilers in the fall of 2023 at its sugar beet processing facility in Moorhead, Minnesota.
Septic tank installation fees and system abandonment
The MPCA provides workshops and conferences to help solid waste landfill operators get certified and stay up to date.
The MPCA issued a new air quality permit for this manufacturing facility in White Bear Township.
Understanding small-scale differences in air pollution is important for minimizing exposure to harmful air pollutants, particularly for vulnerable communities.
Tailings basin piping leaked wastewater and about 11,500 cubic feet of tailings materials over nearly half an acre, including a nearby wetland in May 2023 due to inadequate operation and maintenance of the tailings basin pipeline at the company’s facility in Virginia, Minn.
Project began construction in October 2022 without a stormwater permit or a stormwater pollution prevention plan, and failed to install erosion and sediment controls at a pond and wetland improvement site near Finlayson, Minn.
Failed to properly operate its wastewater treatment facility for the River Park housing development in Oronoco, Minnesota, from Aug.-Dec 2023 before connecting to the newly constructed Oronoco wastewater treatment plant.
MPCA investigation found stormwater permit violations that occurred during a construction project in 2025, with sediment-laden stormwater entering a stream at a construction site in Chaska.
New MPCA report monitors PFAS sources and movement, provides direction for preventing and managing PFAS pollution.
Alliance Building Corporation failed to prevent liquid washout of waste during construction at the Sleepy Eye Apartments.
American Peat Technology paid a penalty of $12,468 for failing to properly maintain and inspect equipment designed to monitor and reduce air pollution.
Certain proposed projects — based on their nature, size, location, or other factors — must go through an environmental review before any required permits or approvals are issued.