Search
General Waste and Recycling, LLC plans to convert approximately 19 acres of permitted industrial solid waste space in Itasca County so that it can accept nearly 100,000 cubic yards of municipal solid waste (MSW) per year.
The Metropolitan Council proposes adding a fourth wastewater incinerator which requires an amendment to the facility’s current air emissions permit.
Smart Salting is a suite of techniques that minimize the environmental and economic impacts of chloride while still meeting public needs.
Minnesota’s Continuous Nitrate Sensor Network generates publicly available water quality data on nitrate levels in our surface water.
Details for solid waste management facility permit issuance and reissuance.
Vapor intrusion occurs when chemical vapors migrate from contaminated groundwater through the soil into the basements or foundations of buildings.
Create an editable spreadsheet with the information indicated below. Each step in your calculations needs to be clear and easy to follow.Facility informationProvide the facility ID, file number, and…
New rules establish a program for the MPCA to collect information about products containing intentionally added PFAS and establish fees to be paid upon submission of required reporting.
Composting organic waste and compostable products creates a valuable product that improves soil fertility, conserves water, and reduces erosion.
Contact the Minnesota Pollution Control Agency by phone or online form. This page includes office locations and options to requests for assistance or report emergencies.
Air quality dispersion modeling uses a computer model to estimate air pollution concentrations from regulated facilities and other sources of pollution.
East Central Solid Waste Commission (ECSWC) proposes to add 1.7 million cubic yards of MSW capacity to their landfill near Mora, Minnesota, which requires an environmental impact statement.
A successful cleanup of contaminated land along the Cedar River in Austin caps a long history of industrial pollution.
The Legislature has given the MPCA the authority to develop rules to protect state environmental resources.
Enbridge Energy is continuing restoration work around its new Line 3 crude oil pipeline across Minnesota. The new line replaces an aging Line 3 and began operating in October 2021, after Enbridge completed the project’s construction phase.
Canby Creek now flows into Del Clark Lake and protects Canby from flooding, while providing outdoor recreation and excellent water quality.
Thirty TMDLs undertaken in the Mississippi River - Twin Cities Watershed to address excess nutrients, turbidity, bacteria, and more.
The MPCA Brownfield Program is a fee-for-service program that provides assistance to promote the investigation, cleanup, and redevelopment of property that is contaminated with petroleum and hazardous substances.
State Superfund sites are listed on the Minnesota Permanent List of Priorities (PLP) primarily in order to access funding when responsible parties are unwilling or unable to conduct the necessary site investigation and cleanup.
Riverview LLP is seeking to expand its existing West River Dairy facility near Morris from 7,855 cows to a total capacity of 18,855 cows.