Search
MPCA investigation in 2025 found that Sheldahl Flexible Technologies submitted incorrect permit applications and failed to obtain MPCA approval prior to installing or modifying three pieces of industrial mixing equipment.
KODA Energy violated its air permit in Scott County from June 2023 to February 2024, according to a Minnesota Pollution Control Agency (MPCA) enforcement investigation. The investigation found KODA energy was burning waste-treated corn and should have submitted a major permit amendment before burning an industrial solid as a waste-to-energy incineration facility.
Clean heavy-duty off-road equipment grants fund the replacement of older, more polluting diesel equipment with newer, cleaner technology.
Sandblasted material from a construction site was deposited on a parking ramp next door.
Violated Minnesota rules and federal standards on several occasions at a barley malting facility located in Moorhead, Minnesota.
Del Zotto tanks had weep holes drilled near the bottom of tanks to drain rainwater from the tanks while they are stored to prevent freezing and they will offer a warranty to replace tanks bought with weep holes for owners of its 2,500-gallon tanks.
The Meadows Mobile Home Park discharged untreated sewage to the ground in two separate violations in 2025.
The MPCA fined West Fraser Forest Products $24,750 for exceeding the total amount of hazardous air pollutants (HAPs) allowed by the air permit for the company’s Solway facility from January 2024 to January 2025.
An inspection in 2024 discovered multiple violations at this site in , including failure to conduct testing of tank systems that prevent leaks and corrosion and a broken gauge used in tank leak detection tests.
MPCA investigation found that Shearer’s Foods operated without an air permit and submitted incomplete applications during the permit process.
New Flyer of America, a bus assembly plant in Saint Cloud, paid $12,112.50 for hazardous waste violations.
MPCA investigation in May 2024 found violations related to stormwater at three facilities.
The Lake Allie wastewater treatment facility will pay more than $13,000 in fines and follow a corrective action plan for violating its wastewater permit in Buffalo Lake, Minn.
The discharges in summer 2024 happened during the construction of the MnDOT truck facility in Eden Prairie, Minnesota.
ECSWC is applying for a 10-year permit to add MSW capacity to its currently permitted landfill near Mora while conducting environmental review for the unpermitted areas of its landfill expansion.
The Burnsville Sanitary Landfill (BSL) will expand to accommodate the growing municipal waste needs of the Twin Cities metro area. The expansion is part of the landfill’s long-term plan to extend the useful life of the landfill to 2062.
The Minnesota Pollution Control Agency (MPCA)’s draft wastewater permit for the 3M facility at Cottage Grove adds new water quality protections for the Mississippi River and improves accountability through monitoring and reporting requirements. The draft permit is one of the most rigorous in state history and mandates the removal of certain per- and polyfluoroalkyl substances (PFAS) to levels below detection.
MagIron LLC proposes to restart a mining and processing facility near Grand Rapids, which will require new air and industrial wastewater permits from the MPCA.
A program to provide sustainable, longer-term funding a select number watersheds to make measurable and visible progress.
An MPCA investigation determined that General Mills violated state rule at its oat processing facility in Fridley on several occasions from 2019 through 2023.