Search
New Flyer of America, a bus assembly plant in Saint Cloud, paid $12,112.50 for hazardous waste violations.
MPCA investigation in May 2024 found violations related to stormwater at three facilities.
The Lake Allie wastewater treatment facility will pay more than $13,000 in fines and follow a corrective action plan for violating its wastewater permit in Buffalo Lake, Minn.
The discharges in summer 2024 happened during the construction of the MnDOT truck facility in Eden Prairie, Minnesota.
ECSWC is applying for a 10-year permit to add MSW capacity to its currently permitted landfill near Mora while conducting environmental review for the unpermitted areas of its landfill expansion.
The Burnsville Sanitary Landfill (BSL) will expand to accommodate the growing municipal waste needs of the Twin Cities metro area. The expansion is part of the landfill’s long-term plan to extend the useful life of the landfill to 2062.
The Minnesota Pollution Control Agency (MPCA)’s draft wastewater permit for the 3M facility at Cottage Grove adds new water quality protections for the Mississippi River and improves accountability through monitoring and reporting requirements. The draft permit is one of the most rigorous in state history and mandates the removal of certain per- and polyfluoroalkyl substances (PFAS) to levels below detection.
The MPCA has announced five grant recipients who will receive a combined total of more than $1 million in grants for projects to increase the efficiency and effectiveness of waste reduction, reuse, recycling, and composting efforts in Greater Minnesota communities.
MagIron LLC proposes to restart a mining and processing facility near Grand Rapids, which will require new air and industrial wastewater permits from the MPCA.
A program to provide sustainable, longer-term funding a select number watersheds to make measurable and visible progress.
An MPCA investigation determined that General Mills violated state rule at its oat processing facility in Fridley on several occasions from 2019 through 2023.
During a residential construction project in Franklin Township in 2024, Capstone Homes and Arnt Construction failed to properly manage construction stormwater activities.
An MPCA investigation determined David Heinonen of Grand Rapids filled in 3,200 square feet of wetland near Horsehead Lake in Itasca County without prior approval and engaged in unpermitted construction activities on 1.57 acres on the shore of Horsehead Lake.
The MPCA fined Regions Hospital $100,000 for improperly disposing of infectious waste in its mixed municipal solid waste in 2024.
MPCA investigation determined Derek Vekich committed stormwater and wetland violations in 2024.
Unauthorized releases of untreated wastewater in October 2024 and January and February 2025, as well as failure to notify the Minnesota Duty Officer in a timely manner.
Lakes Concrete Plus, Inc. paid $25,000 in fines for selling 1,500-gallon and 2,000-gallon septic tanks from 2019 to 2022 that may contain weep holes, a violation of Minnesota law.
BNSF Railway Company paid a fine of $20,000 for industrial stormwater and wastewater permit violations at its Willmar facility.
Green Plains Fairmont, LLC paid $14,175 for an ethanol spill that lasted four days and contaminated groundwater.
MPCA investigation found stormwater permit violations that occurred during a construction project in 2025, with sediment-laden stormwater entering a stream at a construction site in Chaska.