Search
The discharges in summer 2024 happened during the construction of the MnDOT truck facility in Eden Prairie, Minnesota.
During a residential construction project in Franklin Township in 2024, Capstone Homes and Arnt Construction failed to properly manage construction stormwater activities.
Violated Minnesota rules and federal standards on several occasions at a barley malting facility located in Moorhead, Minnesota.
Hutchinson Utilities exceeded its permit limit for particulate matter during an air quality performance test. High levels of particulates are known to cause environmental harm and health problems.
Nottingham Construction failed to notify the MPCA that it was demolishing a property in Mahtomedi that contained asbestos and failed to send the asbestos demolition debris to a permitted facility.
MPCA's compliance and enforcement program tracks how well wastewater treatment facilities are complying with their permits and takes enforcement actions when necessary.
MPCA investigation confirms discharges sediment-laden water into the Long Prairie River, in addition to other violations, during construction of CSAH 56 & 38.
In 2010, the MPCA began receiving public inquiries about projects to mine silica sand for use in hydraulic fracturing, or “fracking,” a drilling method used for natural gas and oil wells.
An MPCA investigation determined that General Mills violated state rule at its oat processing facility in Fridley on several occasions from 2019 through 2023.
Grede Foundry violated the terms of its air permit in 2024, according to a Minnesota Pollution Control Agency investigation.
Louisiana-Pacific has been fined $15,775 for stormwater and wetland violations according to a Minnesota Pollution Control Agency (MPCA) enforcement investigation. Louisiana-Pacific operates a wood-board manufacturing facility in Two Harbors, Minnesota.
Shopping for a new wood stove? Remember that new stoves and outdoor boilers must be certified to new 2020 emission standards to be sold in Minnesota.
MPCA investigation determined that construction sediment was discharged into the Blue Earth River and a county ditch.
An MPCA investigation found that Benson Municipal Utilities failed to conduct required carbon monoxide tests within their permit deadline for their five generators providing emergency power services to the city.
Al-Corn Clean Fuel, LLC, an ethanol plant in Dodge County, paid $40,427 in fines for air permit violations.
An MPCA investigation determined David Heinonen of Grand Rapids filled in 3,200 square feet of wetland near Horsehead Lake in Itasca County without prior approval and engaged in unpermitted construction activities on 1.57 acres on the shore of Horsehead Lake.
MPCA investigation determined Derek Vekich committed stormwater and wetland violations in 2024.
Application forms and instructions for applying for wastewater permits.
An MPCA investigation found violations related to construction of a home on Schwappauff Lake, near the town of Greenfield in Hennepin County.
Metal recycler in Brainerd constructed and operated a metal shredder without obtaining an air permit and under-reported VOC emissions in 2022.