Search
Determine what type(s) of water quality permit is required at facilities that mine construction sand and gravel; industrial sand; quarry limestone, granite or dimension stone; operate hot mix asphalt production areas; produce concrete block, brick and other products; and/or produce ready-mix concrete.
Create an editable spreadsheet with the information indicated below. Each step in your calculations needs to be clear and easy to follow.Facility informationProvide the facility information listed on…
Starting Jan. 1, 2025, the first prohibitions of products containing intentionally added PFAS took effect in Minnesota.
Application forms and instructions for applying for wastewater permits.
In early 2024, Minnesota became the first U.S. state to establish a product stewardship program for boat wrap, which must provide free collection, transportation, reuse, recycling, and disposal.
MPCA recognized 253 municipal and industrial wastewater treatment plants for outstanding operations in 2023.
As part of the PFAS pollution prevention law called Amara’s Law, manufacturers are required to report intentionally added PFAS in products sold in Minnesota and pay a fee. The Minnesota Pollution Control Agency has extended the reporting due date to Sept. 15, 2026.
Owners/operators of construction activity must complete several steps before completing a permit application and beginning construction. These steps also help owners/operators determine their eligibility for coverage under the general permit.
A water quality variance is a temporary change in a state's water quality standard for a specific pollutant and its relevant criteria, allowing deviation from meeting a water quality-based effluent limit for a particular discharger.
The MPCA closed 118 enforcement cases for water quality, air quality, waste, stormwater, and wastewater violations in the second half of 2023.
From January through March 2025, MPCA air monitoring data showed elevated lead levels that exceeded national ambient air quality standards near the facility. An MPCA inspection of Gopher Resource in spring 2025 confirmed that the source of the elevated lead levels was addressed.
Pagination
- First page
- Previous page
- …
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17