Search
Thermal paper is thin with a slick feel or sheen finish and discolors easily when scratched.
General Waste and Recycling, LLC plans to convert approximately 19 acres of permitted industrial solid waste space in Itasca County so that it can accept nearly 100,000 cubic yards of municipal solid waste (MSW) per year.
The MPCA invites public comment on its draft environmental impact statement (EIS) for a new municipal solid waste landfill that Dem-Con has proposed at its environmental campus near Shakopee.
A permit extension notification allows transfer stations and source-separated organic material (SSOM) compost facilities to apply for an extension of their permit without a complete permit reissuance application.
A gateway to common regulatory information that affects stationary engines.
This feature summarizes findings from four WRAPS reports in 2024: Root River, Mississippi River-St. Cloud, Pomme de Terre River, and Mississippi River-Lake Pepin Tributaries.
To make electric school buses more affordable to school districts, the MPCA started a grant program that puts more of the cleaner buses on routes across the state.
The MPCA has announced that 11 grant recipients will receive a total of $5.3 million for projects that build lasting capacity to support recycling markets in Minnesota.
MPCA has released the first in a series of reports on industrial uses of PFAS in Minnesota and identifying alternatives.
Township and private party fined $47,555 for failing to obtain a construction stormwater permit for road improvements.
Project began construction in October 2022 without a stormwater permit or a stormwater pollution prevention plan, and failed to install erosion and sediment controls at a pond and wetland improvement site near Finlayson, Minn.
The MPCA recognized 236 wastewater facilities for outstanding operations in 2024.
The Rainy River - Headwaters Watershed covers nearly 1.9 million acres, starting in northern Cook and Lake Counties and flowing west/northwesterly into St. Louis County and the Canadian border waters.
Details on major and minor modifications of a solid waste management facility permit.
Failed to obtain a construction stormwater permit prior to beginning construction and allowed sediment to discharge to wetlands as they built The Meadows housing development in Otsego, Minnesota.
Cleveland-Cliffs owns the Minorca Mine northeast of Virginia, Minnesota. The mine’s two taconite mining pits are about one mile southeast of the plant.
Dem-Con Landfill proposes to build a new municipal solid waste landfill at its environmental campus near Shakopee. It plans to convert 2.2 million cubic yards covering an approximately 81-acre fill area of its permitted construction and demolition landfill into a new municipal solid waste landfill. The creation of a new MSW landfill of this size requires the project to go through the environmental impact statement process.
The MPCA regulates both underground and aboveground commercial storage tanks above a certain size that hold petroleum or hazardous liquids.
Pretreatment by commercial facilities and other non-domestic wastewater sources removes harmful pollutants before the wastewater is discharged to a municipal sewer system. The U.S. EPA has delegated MPCA the authority to approve pretreatment programs at the local level and oversee statewide pretreatment activities.
Smart Salting is a suite of techniques that minimize the environmental and economic impacts of chloride while still meeting public needs.