Wastewater Engineering/Technical Information
The technical review and approval process of wastewater treatment facilities (WWTF) provides the public with assurance that proposed WWTF projects will comply with applicable permits and rules, meet reliability criterion and comply with recognized engineering practice.
Guidance for the Minnesota Pollution Control Agency's (MPCA) technical review and approval of wastewater treatment facility (WWTF) process design is available below.
Photo courtesy of Richard S. TamkeTo speed the review and approval of your design documents, please complete the applicable checklists from the list below and submit them with your plans and specifications.
Note: Acceptable design standards are, in part, based on "Recommended Standards for Wastewater Facilities," 1997 edition (Ten States Standards).
Engineering/Technical Publications
High Density Polyethylene Liner Guidance (wq-wwtp5-32)
Polyvinyl Chloride Liner Guidance (wq-wwtp5-60)
Electronic Submittal: Wastewater Treatment Facility Construction Record Documents (wq-wwtp5-87)
(1/11)
Design Flow and Loading Determination Guidelines for Wastewater Treatment Plants
Design Guidance for Large Subsurface Wastewater Treatment Systems (LSTS) (wq-wwprm8-01)
Understanding the MPCA's Groundwater Nitrate Nitrogen Policy for Large, Subsurface Wastewater-treatment Systems (LSTSs) (wq-wwprm1-10)
LSTS Permitting Letter, August 2002
Transfer of MPCA Wastewater Permits: A Homeowner's Association Guide
Engineering and Hydrologic Work Product - Submittal Cover Sheet
Guidance and Submittal Requirements for Rapid Infiltration Basin Wastewater Treatment Systems
Guidelines for wastewater-treatment facilities during a flood
Facts About Sewage Bypass. This provides a brief overview of the problems, causes, environmental impacts and prevention options associated with sewage overflows.- Reliability for Mechanical Wastewater Treatment Plants
Riprap Criteria for Stabilization Ponds. Provides guidelines that describes the materials, installation and testing of riprap. (4 pp).- Scheduled Maintenance Bypassing Review Guidelines
Decommissioning or Relining Domestic Wastewater Ponds (wq-wwtp5-86)
Recommended Pond Design Criteria (wq-wwtp5-53)
Prefill and Water Balance Criteria (wq-wwtp5-61b)
Prefill and Water Balance Raw Data Collection Worksheet form (wq-wwtp5-61c)
Report on Evaluation of Minnesota Water Balance Test (wq-wwtp5-61e)
Technical Review and Approval Checklists
Aerobic Sludge Digestion
Anaerobic Sludge Digestion
Aerated Pond
Biological Treatment Checklist - Suspended Growth - Activated Sludge, Oxidation Ditches-
Biological Treatment Checklist - Attached Growth - Trickling Filter (PDF Version) (wq-wwtp5-11)
Centrifuges, Solid Bowl
Chemical Addition
Composting
Disinfection System
Dissolved Air Flotation Thickening
Filtration
Gravity Thickener
Grit Chambers
High pH Lime Sludge Stabilization
Mechanical Dewatering Facilities
Pressure Filtration
Primary Treatment Checklist - Wet Well, Raw Sewage Pumps, Bar Screens and Comminutor
Rapid Infiltration Basins
Septage
Settling
Sludge Drying Beds
Vacuum Filtration