Search
Create an editable spreadsheet with the information indicated below. Each step in your calculations needs to be clear and easy to follow.Facility informationProvide the facility information listed on…
States are responsible for developing a Regional Haze State Implementation Plan (SIP) that addresses regional haze in each Class I area located within the state and in each Class I area located…
Certain proposed projects — based on their nature, size, location, or other factors — must go through an environmental review before any required permits or approvals are issued.
MPCA plans to amend existing Minnesota Rules governing permits and solid waste landfills (chapters 7001 and 7035).
Environmental information for craft breweries, distilleries, wineries, and cideries, and for home brewers who want to start commercial production.
Image Facilities with one or more aboveground storage tank (AST) with a total capacity of one million gallons or more must obtain a major facility…
Completed rulemaking for changes to reporting requirements for hazardous air pollutants (HAPs).
Alliance Building Corporation failed to prevent liquid washout of waste during construction at the Sleepy Eye Apartments.
An August 2023 MPCA inspection confirmed failures to conduct weekly inspections and train staff to properly handle and store hazardous waste at its residential and commercial cabinet production facility in St. Cloud.
To obtain coverage under this permit, the owner(s) must document compliance with the criteria for coverage under this general permit, prior to disposal of the uncontaminated concrete.
Complaints of discrimination will be investigated
Organizations that want to reuse materials in ways not classified as standing beneficial uses must apply to the MPCA for a case specific beneficial use.
ECSWC is applying for a 10-year permit to add MSW capacity to its currently permitted landfill near Mora while conducting environmental review for the unpermitted areas of its landfill expansion.
Central Specialties Inc., based in Alexandria, violated several air permit conditions between 2021 and 2023 for its mobile hot-mix asphalt facility stationed at various locations around the state. Violations included failing to properly maintain pollution control equipment and inadequate recordkeeping and reporting.
Industrial Finishing Inc. violated several water quality permit conditions relating to required sampling, training, reporting and inspections at its industrial equipment coating and finishing facility in Deer Creek, Minn.
As part of the PFAS pollution prevention law called Amara’s Law, manufacturers are required to report intentionally added PFAS in products sold in Minnesota and pay a fee. The Minnesota Pollution Control Agency has extended the reporting due date to Sept. 15, 2026.
Facilities that have site-specific state implementation plan (SIP) requirements may make changes to their operations that require changes to either their Administrative Order or Title I SIP…
Forms and guidance for local partners submitting surface water data, QA/QC information and progress reports to MPCA.
Coal tar-based sealants can no longer be sold or applied legally in Minnesota as of 2014.
Industrial Stormwater Steps to Compliance Step 4: Create SWPPP, choose BMPs