Agropur Inc., doing business as Le Sueur Cheese Company, land applied too much industrial byproduct, resulting in rates of nitrogen and phosphorus that exceeded the allowed limits by more than 10 percent. The violations occurred in 2022, near its cheese production facility in Le Sueur, Minnesota.
Guidance on NPDES/SDS construction stormwater requirements
The Minnesota Pollution Control Agency (MPCA) is expanding the ways we learn and understand the effects of pollution on communities and the environment by incorporating lived experiences into our air…
The Minnesota Pollution Control Agency (MPCA)’s draft wastewater permit for the 3M facility at Cottage Grove adds new water quality protections for the Mississippi River and improves accountability through monitoring and reporting requirements. The draft permit is one of the most rigorous in state history and mandates the removal of certain per- and polyfluoroalkyl substances (PFAS) to levels below detection.
MPCA investigation found stormwater permit violations that occurred during a construction project in 2025, with sediment-laden stormwater entering a stream at a construction site in Chaska.
MPCA investigation found that Heron Lake BioEnergy LLC exceeded its permitted limits of particulate matter (PM) and hazardous air pollutants (HAPs) at its plant in Jackson County.
Failed to properly operate its wastewater treatment facility for the River Park housing development in Oronoco, Minnesota, from Aug.-Dec 2023 before connecting to the newly constructed Oronoco wastewater treatment plant.
An MPCA investigation found that Benson Municipal Utilities failed to conduct required carbon monoxide tests within their permit deadline for their five generators providing emergency power services to the city.
Heartland Corn Products failed emission stack tests in November 2021 and February 2022 for volatile organic compounds and particulates at its ethanol production facility in Winthrop, Minn.
Failed emissions performance stack tests on two boilers in the fall of 2023 at its sugar beet processing facility in Moorhead, Minnesota.
As part of our commitment to continuous improvement, transparency, certainty, and customer service, the MPCA is improving the way we track and administer permits. These efforts are part of periodical…
Any facility that emits air pollutants above certain levels is required to have an air quality permit.
A 2008 law requires the MPCA to analyze and consider “cumulative levels and effects of past and current pollution” for air permits in a specific part of south Minneapolis.
Pesticide NPDES permit steps to compliance: Terminating pesticide permit
Answers to common questions about the Construction Stormwater Permit application
Where possible, permit holders must use MPCA's e-Services to apply for reissuance and administrative amendments.
To obtain coverage under this permit, the owner(s) must document compliance with the criteria for coverage under this general permit, prior to disposal of the uncontaminated concrete.
Chloride is a problem for wastewater facilities and stormwater permittees.