Regulatory due dates for small businesses in Minnesota

AQ = Air quality, WQ = Water quality, HW = Hazardous waste

Type

Regulation

Submittal

Due date

AQ

Air Permit – all

Emission Inventory Fees (for previous year)

March mailing, due within 60 days

AQ

Air Permit – all

Emission Inventory

April 1

AQ

Air Permit – all

Corrections to Emission Inventory

November mailing, corrections due within 45 days

AQ

Air Permit – Option D, if control equipment is used to reduce actual reported emissions

Microsoft Office document icon DRF-2: Deviations Identified by Periodic Monitoring Systems or Through Recordkeeping

January 30
July 30

AQ

Air Permit – State or Federal Total Facility or General permit

Microsoft Office document icon DRF-2: Deviations Identified by Periodic Monitoring Systems or Through Recordkeeping

January 30
July 30

AQ

Air Permit – State or Federal Total Facility or General permit

Compliance Certification

January 31

AQ

Air Permit – Non-metallic Mining (sand and gravel)

Microsoft Office document icon aq-f4-nmdrf.pdf

January 30
July 30

AQ

Air Permit – Non-metallic Mining (sand and gravel)

Microsoft Office document icon aq-f4-nmcr.pdf

January 31

AQ

Air Permit – Non-metallic Mining (sand and gravel)

Microsoft Office document icon RE-01 Relocation Notification Form - Air Quality Permit Program - Form

48 hours before relocating

AQ

NESHAP -- Chromium Electroplating and Anodizing (area source)

Compliance Report (no exceedances)

January 30

AQ

NESHAP -- Chromium Electroplating and Anodizing (area source)

Compliance Report (with exceedances)

January 30
July 30

AQ

NESHAP -- Dry Cleaner, Perc machine

Microsoft Office document icon Notification of Compliance Status - Dry Cleaning - NESHAPs - form

30 days after installation

AQ

NESHAP – Halogenated Solvent (area source)

Compliance Report (for a newly installed machine)

Within 150 days of startup

AQ

NESHAP – Halogenated Solvent (area source)

Microsoft Office document icon Microsoft Word - aq-f5-tf08.doc

January 30
July 30

AQ

NESHAP – Halogenated Solvent (area source)

Microsoft Office document icon Microsoft Word - aq-f5-tf08.doc

January 30
April 30
July 30
October 30

AQ

NESHAP – Halogenated Solvent (area source)

Microsoft Office document icon Microsoft Word - aq-f5-tf07.doc

February 1

AQ

NESHAP – Paint Stripping and Misc Surface Coating (aka “auto body rule”)

Microsoft Office document icon Initial Notification, Compliance Certification, and Notification of Changes - form

180 days after startup

AQ

NESHAP – Paint Stripping and Misc Surface Coating (aka “auto body rule”)

Microsoft Office document icon Initial Notification, Compliance Certification, and Notification of Changes - form

March 1 of the following year

HW

Hazardous waste generators

Fee

January mailing, due date will be on invoice

HW

Hazardous waste generators

License Application

July mailing, due date will be on license application form

WQ

Industrial Stormwater

PDF icon Annual Report Form - NPDES/SDS General Stormwater Permit for Industrial Activity (wq-strm3-55)

Microsoft Office document icon Annual Report Form NPDES/SDS General Stormwater Permit for Industrial Activity (wq-strm3-55)

March 31

WQ

Industrial Stormwater

Quarterly sampling

21st of the month following the end of each sampling interval

WQ

MNG49 – Water Permit for Non-metallic Mining

Quarterly Discharge Monitoring Reports (DMRs)

January 22
April 22
July 22
October 22

*Postmarked by this date

This is not a complete list of due dates.