Air Quality Forms — Permit Application, Notifications, Compliance and Miscellaneous

Available below are air emission permit application forms, compliance reporting forms and other miscellaneous air quality forms from the Minnesota Pollution Control Agency (MPCA).
Instructions for completing and submitting the forms is available below. Each form is available as either a downloadable
Microsoft Word (word processing) file, or as an
Adobe Acrobat pdf file.
Timelines, Instructions, and Tips for Completing and Submitting Application Forms
- Applicants have the option to submit their application on a compact disk (CD), if desired. The application should be a “pdf” document, and must include any calculations (which must also be provided in a spreadsheet on the CD). If you choose to exercise this option, you must still submit a paper copy of any form that includes a signature and a check for any required fees along with the CD. If you choose to instead submit a paper copy of the application, please submit two copies of the application. Note that if you are including non-public (confidential) information in your application, you must also submit a version of the application with the confidential information redacted. If you are using the electronic submittal option, your public and confidential versions must be on separate CDs.
- Submit all applications (whether using the CD or the paper copy option) to: MPCA, Fiscal Services, 520 Lafayette Road, St. Paul, MN 55155-4194.
- The MPCA has a completeness review process for applications for permit amendments, for Part 70 reissuance applications, for permit applications using the Total Facility Permit application forms and for applicability requests. The following completeness checklists are currently in use by MPCA staff:
TFP Application Review Completeness Checklist (aq-f0-acc01, 12/3/12),
Amendment Application Completeness Checklist (aq-f0-acc02, 12/3/12),
Part 70 Reissuance Application Completeness Checklist (aq-f0-acc03, 5/15/12),
Applicability Determination Review Completeness Checklist (aq-f0-acc04, 3/22/12) . Please do not submit the MPCA's completeness checklist with your application or applicability request. Following our completeness review, we will notify you of the status of your application. - The MPCA has a goal of taking final action on priority permits that are needed to authorize construction within 150 days of the receipt of a complete permit application. If the project is subject to PSD, requires air dispersion modeling for criteria air pollutants or air toxics, requires an Environmental Assessment Worksheet (EAW) and/or and Air Emissions Risk Analysis (AERA), or is otherwise complex or potentially controversial, the project may take longer. If your proposed project requires any type of air dispersion modeling, your permit application must contain the final modeling results in order for it to be deemed substantially complete. In order for this to happen, you will need to obtain MPCA approval of your modeling protocol prior to submitting your permit application. See the MPCA webpage on Air Dispersion Modeling for the forms and more information on pre-application approvals. If your proposed project requires an AERA, your permit application must include the necessary AERA forms and information – see Air Emissions Risk Analysis (AERA) — Forms and Deliverables. If your AERA project uses a refined analysis based on EPA’s Human Health Risk Assessment Protocol (e.g. IRAP), you will need to obtain approval on the preliminary AERA package including the protocol form (AERA-26) prior to submitting your permit application and the final AERA results. If you wish to discuss your project with the MPCA prior to application submittal, please contact Steven Pak at 651-757-2633. For questions with the AERA forms and process, please contact Shelley Burman at 651-757-2255.
- If you are located within the city of Minneapolis, you will need to determine if your facility will be subject to permitting requirements under Minn. Stat. 116.07, subd. 4a. For more information, please refer to Cumulative Impacts Air Permitting in South Minneapolis.
- If you would like assistance determining what designation number (EUxxx, CExxx, SVxxx, etc) to use when adding new equipment to an existing facility, refer to the procedures outlined in the July 19, 2007 Air Quality Technical Information Listserv.
- The MPCA also offers an expedited permit process for simple projects. If you need a permit issued faster than the above timelines, contact Steve Pak at 651-757-2633 to discuss your specific situation.
- Application instructions are included with each form. To receive assistance, please call the MPCA at 651-296-6300 or 800-657-3864.
- If your permit or amendment involves particulate matter emission sources, refer to the PM2.5 information and guidance.
For more detailed information on completing permit forms, see the MPCA Air Quality Permit Guide
1. Total Facility Permit Application Forms
Individual forms for the Total Facility Permit Application are listed below and are available as either
MS Word (.doc or .dot) files, or as
Adobe Acrobat pdf files.
A. Miscellaneous:

SCP-01: Submittal Cover Page (revised 11/1/12)
Total Facility Application Instructions (revised 7/5/12)
CR-02: Hood Certification (revised 3/24/09)
HE-01: Hood Evaluation (revised 1/4/08)
IA-01: Insignificant Activities List (revised 9/1/11)
CK-01: Operating Permit Application Requirements (12/3/12)
B. General Information Forms:
GI-01: Facility Information (revised 8/27/09)
GI-02: Process Flow Diagram (revised 5/13/98)
GI-03: Facility and Stack/Vent Diagram (revised 2/16/05)
GI-04: Stack/Vent Information (revised 7/25/05)
GI-05A: Pollution Control Equipment Information (revised 5/23/11)
GI-05B: Emission Unit Information (revised 2/25/10)
GI-05C: Tank Information (revised 7/25/05)
GI-05D: Fugitive Emission Source Information (revised 7/25/05)
GI-07: Facility Emissions Summary (revised 12/14/12)
GI-09: Requirements Form (revised 9/26/11)
GI-09A: Requirements: NESHAP (40 CFR 63) (revised 12/14/12)
GI-09B: Requirements: NESHAP (40 CFR 61) (revised 5/11/98)
GI-09C: Requirements: New Source Review (revised 12/14/12)
GI-09D: Requirements: NSPS (revised 7/11/08)
GI-09E: Requirements: Acid Rain (revised 5/11/05)
GI-09F: Requirements: Stratospheric Ozone Protection (revised 5/11/98)
GI-09G: Requirements: Risk Management Programs for Chemical Accidental Release Prevention (revised 5/11/98)
GI-09H: Requirements: CAM (revised 12/14/12)
GI-09I: Requirements: State Rules (revised 2/29/12)
GI-10: Material Characterization Sheet for Combusting Biomass Materials (revised 10/23/08)
C. Compliance Data Forms:
CD-01: Compliance Plan (revised 9/1/11)
CD-02: Compliance Certification (revised 9/1/11)
CD-03: Compliance Schedule (revised 9/1/11)
CD-05: Compliance Plan for Control Equipment (3/19/08)
D. Emission Calculations Forms:
See the MPCA Web page, Emissions Calculations.
E. Monitoring Equipment Forms:
ME-01: Continuous Monitoring System Information (revised 3/7/06)
F. Modeling Information Forms:
MI-01: Building and Structure Information (revised 6/16/98)
G. EMS Permit Qualifications
EMS-00: EMS Permit Qualification (12/14/10)
2. Change/Modification Application Forms (includes New Source Review Forms)
The "CH" series of forms below replaces all of the previous "MOD" series of forms. All the individual forms for the Change/Modification Application are listed below and are available as either
MS Word (.doc) files, or as
Adobe Acrobat pdf files.
CH-ML-01: Amendment Application Forms Master List and General Instructions (revised 7/5/12) (aq-f2-chml01)
SCP-01: Submittal Cover Page (revised 11/1/12) (aq-f1-scp01)
CH-GI-01: Facility Information (8/27/09)
CH-00: Project Screening (6/15/11)
CH-01: Change Description (3/22/12)
CH-02: Action Type Determination (revised 12/14/12) (aq-f2-ch02)
CH-03: Major Permit Amendment Determination (5/23/11)
CH-04: Determination of New Source Review Status (6/15/11)
CH-04a: Determination of Increases at Major Sources (9/26/11)
CH-04b: Determination of Increases at Minor Sources (7/11/12)
CH-04c: Determination of Greenhouse Gas Status under New Source Review (7/11/12)
CH-04d Calculating the Net Emissions Increase Under New Source Review (9/26/11)
CH-04e Required Elements for a PSD Permit Application (12/16/11)
CH-05: Applicability of New Source Performance Standards (NSPS) (10/22/10)
CH-06: Applicability of Part 61 NESHAP (3/31/04)
CH-07: Applicability of Part 63 NESHAP for Amendments (7/11/12)
CH-08: Administrative Amendment Determination (revised 12/14/12) (aq-f2-ch08)
CH-09: Contravening Permit Terms (12/14/12)
CH-10: Applicability of Minor or Moderate Amendment Process (6/23/11)
CH-11: Crossing Permit Thresholds (7/11/12)
CH-12: Written Notification Form (12/14/12)
CH-13: Applicability of State Rules (revised 2/29/12)-
CH-14 — Complete Notification and Amendment Application Checklist (PDF Version) (aq-f2-ch14) (revised 12/3/12) 
CH-15: SIP Changes and Permits (12/16/11)
CH-16 Applicability Determination Request (6/18/10)
CH-17 Individual Permit Administrative Changes (revised 5/15/12) (aq-f2-ch17)
PAL-01: PAL Cover Page (10/13/03)
PAL-02: Determination of Plantwide Applicability Limit for Major NSR Sources (12/19/08)
MI-02c: Modeling for Plantwide Applicability Limitations (6/30/05)
3. Registration Permit Application Forms
All the individual forms for the Registration Permit are listed below and are available as either
MS Word (.doc or .dot) files, or as
Adobe Acrobat pdf files.
- Registration Permit Handbook. This document is being updated to reflect changes in applicable rules. Please check back at a future date for the revised version of the handbook.

Registration Permit Forms Master List and General Instructions (revised 7/5/12) (aq-f3-rpcover)
RP-01: Facility Information (revised 12/16/11)
SCP-01: Submittal Cover Page (revised 11/1/12) (aq-f1-scp01)
RP-03: NSPS Requirements Form (revised 7/11/08)
RP-04: Estimation Form (revised 12/16/11)
RP-05: Registration Permit Administrative Changes (revised 7/5/12)
RP-06: VOC Log - 12-Month Rolling Sum (revised 7/14/98)
RP-07: NESHAP Requirements Form for Registration Permits (7/11/12)-
Request for Authorization to Use Shingle Scrap in Hot Mix Asphalt (PDF Version) (aq-f3-rp08) (8/17/12) 
RP-C1: Option C - Calculation Form (revised 1/4/08)
RP-D1: Option D Actual Emission Form (revised 12/16/11)
RP-D2: Option D Control Equipment Form (revised 12/14/12)
RP-D3: Option D Hood Certification Form (revised 1/4/08)
RP-D4: Option D Flow Diagram (revised 3/24/09)
4. General Permit Application Forms
A. Non-Metallic Mineral Processing General Permit (12/08/08)
NM-INS: Forms Master List and Instructions – Nonmetallic Mineral Processing General Permit (aq-f4-nmins)
NM-00: Qualifications Review Checklist – Nonmetallic Mineral Processing General Permit (aq-f4-nm00)
NM-02: Facility Information – Nonmetallic Mineral Processing General Permit (aq-f4-nm02)
NM-05: Insignificant Activities Required To Be Listed- Nonmetallic Mineral Processing General Permit (aq-f4-nm05)
NM-06: Compliance Certification – Nonmetallic Mineral Processing General Permit (aq-f4-nm06)
NM-EN: Stationary Internal Combustion Engines Fuel Use- Nonmetallic Mineral Processing General Permit (aq-f4-nmen)
NM-EQ: Equipment and Notification Form – Nonmetallic Mineral Processing General Permit(aq-f4-nmeq)
NM-RE: Location Notification – Nonmetallic Mineral Processing General Permit (aq-f4-nmre)
NM-TP: Test Plan for Opacity Emissions Testing at Crushing, Screening, and Conveying Sources – Nonmetallic Mineral Processing General Permit (aq-f4-nmtp)
B. Part 70 Manufacturing General Permit June 2006
Due to changes to the Minnesota air permitting rules to incorporate the federal permit thresholds for greenhouse gases, the general permits are currently unavailable. No new applications are being accepted at this time. The MPCA will evaluate all existing general permits to determine if they appropriately limit greenhouse gas emissions. If you have any questions, contact Nathan Grand of the MPCA, at 651-757-2166.
C. Part 70 Fiberglass General Permit (December 2009)
Due to changes to the Minnesota air permitting rules to incorporate the federal permit thresholds for greenhouse gases, the general permits are currently unavailable. No new applications are being accepted at this time. The MPCA will evaluate all existing general permits to determine if they appropriately limit greenhouse gas emissions. If you have any questions, contact Nathan Grand of the MPCA, at 651-757-2166.
5. NESHAP Notifications and Record Keeping Forms
A. Drycleaners
B. Halogenated Solvent Cleaners
TF-01: Halogenated Solvent Cleaning Equipment - Initial Statement of Compliance Report - Alternative Standard/Overall Emission Limit (revised 3/31/03)
TF-02: Halogenated Solvent Cleaning Equipment - Initial Statement of Compliance Report - Control Combustion or Idling Emission Limit Standards (revised 6/99)
TF-03: Halogenated Solvent Cleaning Equipment - Compliance Report for Batch Cold Cleaning (revised 3/31/03)
TF-04: Halogenated Solvent Cleaning Equipment - Initial Notification Report for New Machines (Application for Approval of Construction or Reconstruction) (revised 3/31/03)
TF-05: Halogenated Solvent Cleaning Equipment - Initial Notification Report for Existing Machines (revised 3/31/03)
TF-06: Halogenated Solvent Cleaning Equipment - Initial Notification for Batch Cold Cleaning Machines (revised 3/31/03)
TF-07: Annual Report for Halogenated Solvent Cleaning (revised 3/7/06)
TF-08: Exceedance Report for Halogenated Solvent Cleaning Equipment (revised 3/7/06)
TF-09: Compliance Method Change Report - Control Combination or Idling Emission Limit (revised 3/31/03)
C. Chrome Electroplating
NF-01: Notification Form for Existing Chromium Electroplating and Anodizing Tanks (revised 3/31/03)
NF-02: Chromium Electroplating and Anodizing Tanks - Notification of Performance Test (revised 3/31/03)
NF-03: Notification of Construction or Reconstruction of Chromium Electroplating or Anodizing Tanks (revised 3/31/03)
NF-04: Chromium Electroplating and Anodizing Tanks - Notification of Compliance Status (revised 3/31/03)
NF-05: Ongoing Compliance Status Report - Chromium Electroplating and Anodizing Tanks (revised 3/31/03)
D. Miscellaneous Major- and Area-Source NESHAP Notifications
4W-01: Initial Notification Report - Reinforced Plastic Composites Production (NESHAP Subpart WWWW) (12/27/12)
6Q-01: Initial Notification Report/Notification of Compliance Status - Wood Preserving Area Source (NESHAP Subpart QQQQQQ)
6H-01: Initial Notification and Compliance Forms - Paint Stripping and Misc. Surface Coating Operations (NESHAP Subpart HHHHHH)
6H-02: Petition Checklist - Paint Stripping and Misc. Surface Coating Operations (NESHAP Subpart HHHHHH)
4M-01: Initial Notification Report - Surface Coating of Miscellaneous Metal Parts and Products (NESHAP Subpart MMMM) (12/27/12)
4P-01: Initial Notification Report - Surface Coating of Plastic Parts and Products (NESHAP Subpart PPPP) (12/27/12)
4Z-01: Initial Notification Report - Reciprocating Internal Combustion Engines (NESHAP Subpart ZZZZ) (12/27/12)
6. Compliance Record Keeping, Submittals and Reporting Forms

AQRF: Air Quality Reporting Form Checklist for Routine Submittals (8/1/05)
CS-01: Compliance Schedule Progress Report (revised 6/14/99)-
Excess Emissions Reporting Form (aq-f6-drf1) (revised 1/5/12) -
Excess Emissions Reporting Form (aq-f6-drf1) (revised 1/5/12)
DRF-2: Deviations Reporting Form (revised 1/5/12)
Routine Air Report Instructions letter (aq-f6-15 revised 7/27/11)
CR-04: Annual Compliance Certification Report (revised 7/27/11)
CAP-CR-04: Annual Compliance Certification Report for Capped Permits (revised 7/27/11)
WS-01: Worksheet for Determination of Increases at Major Sources (8/20/10)
CAP-WS-01: Pre-Change Analysis for Capped Permits (1/24/11)
PRF-1: Semi-Annual Reporting Form For Plant-wide Applicability Limits (July 2006)
MGCR-04: Part 70 Manufacturing General Permit Annual Compliance Certification Report (June 2006)- Air Emissions Breakdown/Shutdown Notification Form

FGCR-04: Part 70 Fiberglass General Permit Annual Compliance Certification Report
FG-EIL: Fiberglass General Permit Annual Equipment Inventory List
NM-CR: Annual Compliance Certification for the Non-Metallic Mineral Processing General Permit (7/27/11)
NM-DRF: Deviations Reporting Form for the Non-Metallic Mineral Processing General Permit (7/27/11)
7. Miscellaneous Certifications, Requests and Notifications
CR-05: Emergency-Use-Only Certification
DG-01: Delegation of Authority of Responsible Official (revised 4/16/98)
RE-01: Relocation Notification Form (revised 12/16/09)
VR-01: Request to Void an Air Emission Permit (revised 10/22/10)
WC-01: Waste Combustors Needing Permits (revised 10/25/06)
WC-04: Certification Application for Type I, II, III, A, C, D, and Large Hospital Waste Combustors (revised 1/24/08)
WC-05: Certification Application for Class IV or Small Remote Hospital Waste Combustors (revised 7/14/98)
WC-06: Certification Application for a Class IV Metal Recovery Combustor (revised 7/14/98)
WC-07: Application for Municipal Waste Combustor Examiners (revised 1/24/08)
8. Expedited Permit Request Forms
Use the following forms to request expedited review of a permit application or stack test results. The forms may be emailed directly to Expedited Air Permit. For questions about the expedited review process, contact Jeff Hedman at 651-757-2416.
EXP-01: Expedited Project Review (revised 3/11/11)
EXP-03: Expedited Performance Test Review Request (3/11/11) Note form number change (formerly EXP-ST01)
9. Mercury
HG-01: Mercury Releases to Ambient Air (10/25/06)
10. Capped Permit Application Forms
These forms may be used by sources electing to apply for the capped permit.
Capped Permit Application Forms Master List and General Insructions (revised 7/512) (aq-f10-capinst)
CAP-00: Qualifications Review List (1/24/11)
SCP-01: Submittal Cover Page (revised 11/1/12) (aq-f1-scp01)
CAP-IA: Insignificant Activities List (9/1/11)
CAP-HE-01: Hood Evaluation and Certification (1/18/08)
CAP-GI-01: Facility Information (08/27/09)
CAP-GI-03: Facility and Stack/Vent Diagram (10/7/04)
CAP-GI-04: Stack/Vent Information (revised 3/7/06)
CAP-GI-05A: Pollution Control Equipment Information (revised 4/19/11)
CAP-GI-05B: Emission Unit Information (revised 2/25/10)
CAP-GI-05C: Tank Information (revised 3/7/06 )
CAP-GI-05D: Fugitive Emission Source Information (revised 3/7/06 )
CAP-GI-07: Facility Emissions Summary (9/1/11)
CAP-GI-09: Requirements Form (10/7/04)
CAP-GI-09A: Requirements: NESHAP For Source Categories (7/11/12)
CAP-GI-09D: NSPS Requirements (1/18/08)
CAP-GI-09F: Stratospheric Ozone Protection Requirements (10/7/04)
CAP-GI-09G: Risk Management Program Requirements (10/7/04)
CAP-GI-09I: State Rules Requirements (5/8/08)
CAP-ADM: Capped Permit Administrative Changes (7/5/12)
11. Part 70 Reissuance Application Forms
The following forms are to be used only when applying for reissuance of an expiring Part 70 permit. To use these forms, you will also need facility-specific information from MPCA’s permitting database. To obtain this information, send an email to Pt70Info with the subject line “Request for Reissuance Materials.” Include all of the following information:
- Existing facility permit number
- Date of expiration of the existing permit
- Name, phone number, and email of facility contact person (such as the designated permit contact person or Responsible Official - this is not the facility’s consultant)
The necessary information will be emailed to the facility contact person, in Portable Document Format (pdf), typically within 5 business days.

Part 70 Permit Reissuance Application Forms Master List (7/5/12)
SCP-01: Submittal Cover Page (revised 11/1/12) (aq-f1-scp01)
CK-01-R: Complete Reissuance Application Requirements Checklist (12/3/11)
IA-01-R: Insignificant Activities Supplemental Information (9/1/11)
CH-01-R: Title V Reissuance - Previous Modifications (10/1/09)
GI-01-R: Facility Information - Supplemental Information for Title V Reissuance (8/4/09)
GI-02-R: Updated Process Flow Diagram for Title V Reissuance (8/4/09)
GI-03-R: Building and Structure Information and Stack/Vent Diagram for Title V Reissuance (3/22/12)
GI-04-R: Facility Description: Stack/Vent (SV) Supplemental Information for Title V Reissuance (5/28/10)
GI-05A-R: Facility Description: Control Equipment (CE) Supplemental Information for Title V Reissuance (6/2/10)
GI-05B-R: Facility Description: Emission Unit (EU) Supplemental Information for Title V Reissuance (7/11/12)
GI-05C-R: Facility Description: Storage Tanks (TK) Supplemental Information for Title V Reissuance (7/11/12)
GI-05D-R: Facility Description: Fugitive Sources (FS) Supplemental Information for Title V Reissuance (7/11/12)
GI-05E-R: Facility Description: Groups (GP) Supplemental Information for Title V Reissuance (8/4/09)
GI-07-R: Potential To Emit — Supplemental Information for Title V Reissuance (revised 4/20/12) (aq-f12-gi07r)
GI-09A-R: NESHAP for Source Categories (40 CFR pt. 63) Supplemental Information for Title V Reissuance (7/11/12)
GI-09D-R: NSPS (40 CFR pt. 60) Supplemental Information for Title V Reissuance (8/4/09)
ME-01-R: Continuous Monitors (MR), Data Acquisition Systems (DA) and Continuous Monitor Systems (CM) Supplemental Information for Title V Reissuance (8/4/09)
CD-01-R: Compliance Plan Supplemental Information for Title V Reissuance (5/28/10)
CD-02-R: Compliance Certfication for Title V Reissuance (8/4/09)
TM-01: Testing and Modeling Information for Title V Reissuance (8/4/09)
Section 12. Checklists for Federal New Source Performance Standards
- NSPS-A: Checklist for NSPS Subpart A, General Provisions - This form is currently unavailable. Refer to EPA's Electronic Code of Federal Regulations (e-CFR) for the current rule language.
- NSPS-DC: Checklist for NSPS Subpart Dc, Standards of Performance for Small Industrial-Commercial-Institutional Steam Generating Units - This form is currently unavailable. Refer to EPA's Electronic Code of Federal Regulations (e-CFR) for the current rule language.
-
Checklist for NSPS Subpart DD, Standards of Performance for Grain Elevators (PDF Version) (aq-f9-nspsdd) (7/11/05) -
Checklist for NSPS Subpart EE, Standards of Performance for Surface Coating of Metal Furniture (PDF Version) (aq-f9-nspsee) (7/11/05) -
Checklist for NSPS Subpart GG, Standards of Performance for Stationary Gas Turbines (PDF Version) (aq-f9-nspsgg) (12/2/07) -
Checklist for NSPS Subpart I, Standards of Performance for Hot Mix Asphalt Facilities (PDF Version) (aq-f9-nspsi) (7/11/05) -
Checklist for NSPS Subpart JJJ. Standards of Performance for Petroleum Dry Cleaners (PDF Version) (aq-f9-nspsjjj) (7/11/05) -
Checklist for NSPS Subpart K, Standards of Performance for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978 (PDF Version) (aq-f9-nspsk) (7/11/05) -
Checklist for NSPS Subpart Ka, Standards of Performance for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23,1984 (PDF Version) (aq-f9-nspska) (7/11/05) - NSPS-KB: Checklist for NSPS Subpart Kb, Standards of Performance for Volatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984 - This form is currently unavailable. Refer to EPA's Electronic Code of Federal Regulations (e-CFR) for the current rule language.
- NSPS-OOO: Checklist for NSPS Subpart OOO, Standards of Performance for Nonmetallic Mineral Processing Plants - This form is currently unavailable. Refer to EPA's Electronic Code of Federal Regulations (e-CFR) for the current rule language.
-
Checklist for NSPS Subpart SS, Standards of Performance for Industrial Surface Coating of Large Appliances (aq-f9-nspsss) (7/11/05) -
Checklist for NSPS Subpart TTT, Standards of Performance for Industrial Surface Coating of Plastic Parts for Business Machines (PDF Version) (aq-f9-nspsttt) (7/11/05) -
Checklist for NSPS Subpart XX, Standards of Performance for Bulk Gasoline Terminals (PDF Version) (aq-f9-nspsxx) (7/11/05)
13. Greenhouse Gas Emissions
-
Deferral for CO2 Emissions From Biogenic Sources (aq-rule4-05q)