Petroleum Remediation Program Publications:
Guidance Documents for Underground Storage Tank (UST) and Aboveground Storage Tank (AST) Release Cleanup
To subscribe or unsubscribe to Remediation Division updates, visit the MPCA’s GovDelivery Remediation Division E-mail subscription page.
The following publications provide guidance information about managing aboveground and underground storage tanks.
General Guidance
-
Green and Sustainable Remediation (c-prp1-10) (8/2012) NEW! -
Underground Storage Tank and Petroleum Remediation Quality Assurance Program Plan (p-eao2-04) -
1-01 Petroleum Remediation Program General Policy (c-prp1-01) -
1-02 MPCA Information Request Policy (Web only) (c-prp1-02) -
1-03 Spatial Data Collection at Petroleum Remediation Sites (c-prp1-03) -
1-03a Spatial Data Reporting Form (PDF Version) (c-prp1-03a) -
You as a Responsible Party in the PRP (c-prp1-04)
Leak Site Ownership Form (c-prp6-07)
-
Procedures for Assessing Contamination at Large Above-ground Storage Tank Sites (c-er4-12)
Release Reporting
-
2-01 Reporting of Petroleum Releases (c-prp2-01) (10/2012)
2-02 Light Non-Aqueous Phase Liquid Management Strategy (7/2010) (c-prp2-02)
2-03 Light Non-Aqueous Phase Liquid Recovery Report (7/2010) (c-prp2-03)
2-04 Recent Surface Spills at Tank Sites
2-05 Release Information Worksheet (2/2010)
2-07 Petroleum Release Notification Follow-up
2-08 Petroleum Release Notification Follow-up Template
Soil Excavation and Treatment
-
3-01 Excavation of Petroleum Contaminated Soil (c-prp3-01) (9/2008)
3-02 General Excavation Report Worksheet (2/2010)
3-02a Corrective Action Excavation Report Worksheet (c-prp3-02a) (9/2008)
3-03 Land Treatment of Petroleum Contaminated Soil
3-04 Application for a Petroleum Contaminated Soil Land Treatment Site (Form A)
3-05 Application to Land Treat Petroleum Contaminated Soil at an Approved Site (Form B)
3-06 Notification of Spreading Petroleum Contaminated Soil at a Land Treatment Site (Form C)
3-07 Soil Monitoring results for Land Treated Petroleum Contaminated Soil (Form D)
3-08 Permit Application for a Land Treatment Facility- 3-09 Currently Permitted Petroleum-contaminated Land Treatment Sites and Facilities
3-10 Thermal Treatment of Petroleum Contaminated Soil
3-11 Application to Thermally Treat Petroleum Contaminated Soil
3-12 Thermal Treatment Facilities
3-13 Composting of Petroleum Contaminated Soil
3-14 The Facts About Composting
3-15 Land Treatment General Information-
3-16 Assessment of Petroleum Contamination at Closed Sites (c-prp3-16) (9/2012)NEW!
3-17 Thin Spreading Small Quantities of Petroleum Contaminated Soil
Site Investigation and Risk Evaluation
-
4-01 Soil and Groundwater Assessments Performed during Site Investigations (c-prp4-01) (9/08)
4-01a Vapor Intrusion Assessments Performed During Site Investigations (c-prp4-01a) (10/2010)
Vapor Intrusion Interior Building Survey Form (c-rem3-01a) (8/2010)
4-01c Intrusion Screening Values (c-prp4-01c) (10/2010)
Vapor Intrusion Technical Support Document (c-rem3-01) (8/2010)
4-02 Potential Receptor Surveys and Risk Evaluation Procedures at Petroleum Release Sites (c-prp4-02) (12/09)
4-03 Assessment of Natural Attenuation at Petroleum Release Sites (c-prp4-03) (4/2005)
4-04 Soil Sample Collection and Analysis Procedures (c-prp4-04) (9/2008)
4-05 Ground Water Sample Collection and Analysis Procedures (c-prp4-05) (9/2008)
4-06 Investigation Report Form (c-prp4-06) (9/2008)
4-08 Monitoring Report (c-prp4-08) (9/2008)
4-09 Ground Water Investigations in Karst Areas (c-prp4-09) (4/2005)
4-17 FAQs about Investigation and Remediation of AST Facilities (c-prp4-17) (4/2005)
4-18 Public Water Supply Risk Assessment at Petroleum Remediation Sites (c-prp4-18) (7/2010)
4-21 Investigation Requirements for Ethanol-Blended Fuel Releases (c-prp4-21) (7/2010)
Development
-
Brownfield Program Services (c-brwnfld4-01) (09/2012) -
5-01 Managing Petroleum Contaminated Soil at Public Works Project (c-prp5-01) (9/2008)
5-03 Petroleum Brownfields Program Response Action Plans (c-prp5-03) (5/2011)
Voluntary Remediation Programs Enrollment Application Form (c-vic3-01) (6/2012)
Best Management Practices for the Off-Site Reuse of Unregulated Fill (c-rem1-01) (2/2012)
Corrective Action
7-01 Corrective Action Design and Implementation (c-prp7-01) (1/2011)
7-02 Conceptual Corrective Action Design Report (CCAD) (c-prp7-02) (1/2011)
7-03 Focused Investigation Work Plan (c-prp7-03) (1/2011)
7-04 Focused Investigation Report (c-prp7-04) (1/2011)
7-05 Pilot Test Work Plan (c-prp7-05) (1/2011)
7-06 Pilot Test Report (c-prp7-06) (1/2011)
7-07a Remediation System Detailed Corrective Action Design Report (SDCAD) (c-prp7-07a) (1/2011)
7-07b Excavation Detailed Corrective Action Design Report (EDCAD) (c-prp7-07b) (1/2011)
7-08 Remediation System Operation Monitoring Report (RSOM) (c-prp7-08) (1/2011)
7-09a Air Emission Controls (c-prp7-09a) (1/2011)
7-09b Air Emissions Screening Spreadsheet (c-prp7-09b) (7/2011)
7-10 Discharging Contaminated Groundwater (c-prp7-10) (1/2011)