http://www.pca.state.mn.us/

tinyURL : duuay9x Home   >   About MPCA   >   News and Media   >   MPCA News Releases

main content

Fairgoers can visit the Eco Experience from 9 a.m. to 9 p.m., from Thursday, Aug. 25, through Monday, Sept. 5.

Experts will be on-hand to help answer your questions about incorporating small- or large-scale renewable energy projects in your home.

You can see electric vehicles up close and learn how electric vehicles improve air quality.

Roberts Automatic Products, a large-quantity generator of hazardous waste, makes machined products in Chanhassen.

Hibbing Taconite’s facility mines and processes taconite ore, producing taconite pellets by grinding, magnetic separation, pellet forming and pellet firing in production furnaces.

The typical Minnesota homeowner could reduce energy use by up to 40% through a combination of conservation and efficiency measures

 

The Eco Experience showcases cutting-edge design and technology in green building

The alleged wastewater and stormwater violations occurred at Prinsco Inc., a manufacturer of plastic drain pipe in Prinsburg.

The company manufactures unsaturated polyester resins at its Minneapolis plant, and gel coats and colorants at its Vadnais Heights plant.

The alleged air quality, hazardous waste, solid waste, and stormwater violations occurred at its wind turbine blade manufacturing plant in Pipestone.

Comments will now be accepted until 4:30 p.m. on Aug. 15, 2011.

In addition to permitting timeliness data, the report includes administrative and program-enhancement efforts underway aimed at improving the overall process.

Join us at the Eco Experience to discover family-friendly, eco-friendly activities.

MPCA services would be limited to critical health and safety activities.

The public comment period runs from June 29 to Aug. 15, 2011.

Over-application of liquid manure, combined with the marginal field conditions due to wet weather last fall, resulted in manure-contaminated water escaping to field drain tiles and to an intermittent stream.

The Eco Experience, a 25,000-square-foot interactive exhibit, returns for its sixth year at the Minnesota State Fair.

B-G-R Dairy has taken steps to correct the alleged deficiencies and must complete all corrective actions by December 1, 2011.

Comments on this report will be accepted until July 20, 2011. Comment period has been extended to Aug. 15, 2011.

Written comments must be received at the MPCA office by July 20, 2011.  Comment period has been extended to Aug. 15, 2011.

The public comment period begins June 20 and continues through July 20, 2011.  Comment period extended to Aug. 15, 2011.

The public comment period runs from June 17 to Aug. 1, 2011.

A public comment period runs through July 13.

The public comment period runs from June 10, 2011, to July 25, 2011.

The violations occurred at an eight-mile construction project on County State Aid Highway 1, near the city of Pine River.

additional content

Connect with us